v111.4flumaweave2026-06-09

Pull CI E2E wiring, defer to post-v1.0 dedicated arc

Reverted ci.yml and playwright.config.ts to pre-v111.4 state after 6 failed amendments. Documented the investigation and proposed real-fix path in a known-bug entry.

v111.4f2026-06-09
  • ·ci.yml reverted to lint-css + typecheck only (no e2e job)
  • ·playwright.config.ts webServer back to npm run dev only, no CI branching
  • ·docs/known-bugs/ci-e2e-vite-cold-start.md: full investigation history + real-fix path
  • ·docs/SHIP_READINESS_ROADMAP.md §4.4: CI E2E wiring added to explicit defer list
  • ·v111.1–v111.3 wins remain banked; v111.5 arc-close now unblocked